BAC LIEU WIND POWER PLANT 310MW - PHASE 3
Year: 2018 - 2019 - 2021
Location: Nha Mat Ward, Bac Lieu city, Bac Lieu Province, Vietnam
The Owner: SuperWind Cong Ly
EPC: PowerChina Zhongnan Engineering Corporation limited
Roles:
-
2018: Topographic and Bathymetric survey
-
2019: Offshore Soil investigation of 47 Boreholes
-
2021: Offshore Soil investigation of 14 Boreholes
Bac Lieu Wind Power Plant Phase 3 with an installed capacity of 141 MW with 47 wind turbine pillars, started in January 2018. Each wind turbine has a capacity of about 2.5 - 3.5 MW. The expected annual electricity output is 373 million kWh [5]
VHS has been awarded to perform more than 90 square kilometres Bathymetric survey in 2018 and 48 boreholes of Soil investigation in 2019 for Bac Lieu wind power plant - Phase 3.
In July 2021, VHS continues to be trusted to conduct Soil investigation of the next 14 holes of the project.