BAC LIEU WIND POWER PLANT 310MW - PHASE 3

Year: 2018 - 2019 - 2021

Location: Nha Mat Ward, Bac Lieu city, Bac Lieu Province, Vietnam

The Owner: SuperWind Cong Ly

EPC: PowerChina Zhongnan Engineering Corporation limited

Roles:

  • 2018: Topographic and Bathymetric survey

  • 2019: Offshore Soil investigation of 47 Boreholes

  • 2021: Offshore Soil investigation of 14 Boreholes

Bac Lieu Wind Power Plant Phase 3 with an installed capacity of 141 MW with 47 wind turbine pillars, started in January 2018. Each wind turbine has a capacity of about 2.5 - 3.5 MW. The expected annual electricity output is 373 million kWh [5]

VHS has been awarded to perform more than 90 square kilometres Bathymetric survey in 2018 and 48 boreholes of Soil investigation in 2019 for Bac Lieu wind power plant - Phase 3.

In July 2021, VHS continues to be trusted to conduct Soil investigation of the next 14 holes of the project.