BINH DAI WIND POWER PLANT

Year: 2019 - 2020 - 2021

Location: Thua Duc commune, Binh Dai district, Ben Tre province, Vietnam

The Owner: Gulf Mekong

EPC: PowerChina Huadong Engineering Corporation limited

Roles:

  • 2019: Bathymetric survey and Soil investigation for Feasible study stage

  • 2020: Bathymetric survey and Soil investigation of Phase 1,2,3

  • Nov 2020: Side-scan sonar, Subbottom profiling and bathymetric survey for Cable route of Phase 1,2,3

  • 2021:Bathymetric survey of Phase 1

The Binh Dai Wind Power Plant project is located in the southeast sea area of Ben Tre province, Vietnam, about 55km-straight distance from the Ben Tre city centre. The whole project has a total capacity of 310 MW and separates into 8 phases.

In 2019, VHS carried out 10km2 of Bathymetric survey on a scale of 1/2000 and 15 boreholes of soil investigation for the Feasible Study stage of the Project.

In June 2020, VHS carried out 8km2 of Bathymetric survey on a scale of 1/500 and 33 boreholes of Phase 1,2,3.

In Nov 2020, VHS surveyed subsea cable route by Side-scan sonar, Sub-bottom profiler and Multibeam echo sounder.

In April 2021, VHS use Multibeam echo sounder to inspect the condition of the seabed at the position of the Mono-pile.