BAC LIEU WIND POWER PLANT 310MW - PHASE 3
14 Boreholes Soil investigation

Begin: Jul - 2021      Completed: Sep 2021

Location: Nha Mat Ward, Bac Lieu city, Bac Lieu Province, Vietnam

The Owner: SuperWind Cong Ly

EPC: PowerChina International Corporation limited

Roles:​

  • Offshore Soil investigation of 14 Boreholes, 80m each borehole.

  • SPT, CPTu testing

  • Electric resistivity test

  • Miniature vane shear test & pocket penetrometer test

Bac Lieu Wind Power Plant Phase 3 with an installed capacity of 141 MW with 47 wind turbine pillars, started in January 2018. Each wind turbine has a capacity of about 2.5 - 3.5 MW. The expected annual electricity output is 373 million kWh [5]